Swimming Pool Planning

In general there are two processed involved in new pool construction.  The first is the planning process, while the second is the actual swimming pool construction process.  However the planning process is the most important step and good planning is directly related to the successful construction of any swimming pool.  In general the planning process includes consultation and permitting.

During the consultation portion of the planning process, a qualified swimming pool contractor will have a designer meet with the client to determine the features the client wants in the pool, in addition to taking detailed measurements of the site.  The contractor will then prepare a design that meets all required zoning ordinances, including set backs from adjacent properties, as well as incorporating the desired features that the client desires.

In addition, sometimes a landscape architect is brought on board as a member of the team to help design an overall hardscape and landscape plan for the property.  The contractor will also prepare a detailed written estimate of the cost to build the pool.  In some cases the contractor and the client will go thru several revisions of the design before the best of is found that meets zoning ordinances, the features desired by the client and the client’s budget.

Once the plan is developed and the contractor is released to begin work on the pool, more detailed plans will be developed, which will need to be submitted to the city or county the property is located in, as part of the requirements to obtain a building permit.  The detailed plans will provide a guideline for the construction of the pool and will demonstrate that the pool is being constructed to the applicable building and zoning codes.  Depending upon the locality of the property, the building permit will be issued upon “approval” of the plans and payment of all fees.  The pool contractor’s representative will have work diligently throughout the permitting process to obtain the permit s quickly as possible.  Once the permit is obtained, the contractor will be able to start construction and a completed pool is weeks away!

Posted on behalf of Somar Pools

Comments are closed.